WASTE MANAGEMENT SYSTEM (ISWMS)

In Western Macedonia, Greece was constructed an Integrated Solid Waste Management System (ISWMS) which includes a Mechanical Biological Treatment (MBT) Plant, Residual Sanitary Landfill, Waste Water Treatment Plant (WWTP), as well as auxiliary projects such as weigh bridges, administration and office buildings and a washing facility.

During a two-year construction period, we collaborated with HELECTOR SA and we performed the quality control of concrete and pavement works.

PERGANTI WIND FARM

At Akarnanika Mountains in Greece, Themeli S.A built a 41.8 MW wind farm. During the construction of the farm, we carried out the quality control of the concrete foundation, strength tests on grouts for anchoring and compaction tests with bearing plate in surface around the area of the wind turbines.

KASIDIARIS WIND FARM

During the construction of wind farm Kasidiaris (90 MW) in the Municipalities of Zitsa and Pogoniou, Epirus, Greece we collaborate with Tetrkaktis and EL.TECH ANEMOS and we performed quality control of the concrete foundation, strength tests on grouts for anchoring and compaction tests with bearing plate in sub base around the area of the wind turbines.

MUNICIPAL AND ORGANIC WASTE TREATMENT PLANT

Continuous quality control during the construction of reinforced embankment at treatment plant in Alexandroupolis, Greece. Contractor : Mesogeos SA